Sign In Join Help
 
shandong hengwang group

 
 
Recommended Results 
 
Bored Pile Earth Auger Rotary Interlocking Drilling Auger 

  Category : Machinery on-line->Metal Cutting Machine Tools->Skiving Machine

     
Bored Pile Earth Auger Rotary Interlocking Drilling Auger
       

  Product Specification
 
  Model No:      HWDR150
  Country  CN
  Brand  HW
  Packing  Container
  Minimum Order  1
  Payment Term  L/C,T/T,D/P,Paypal,Money Gram

 

    Product Detail
  <p>
<span style="color:#333333;font-family:Arial, Helvetica, sans-senif;font-size:18px;">
<p style="font-family:Arial, Helvetica, sans-senif;">
Rotary Drilling Auger is Easy and flexible opearation: all actions including travel, dozer, turnable swing, work devices plie rotation and feed ect, are all controlled by advanced hydraulic pilot valve. Work operation is in the cabin which can reduce operating force and operator's load and advance the control stability.<br />
1 Bored Pile Earth Auger drill frame angle display is fit in the cab, which make operation clearly.<br />
2 Pile Earth Auger the machine is supplying special clamping fistures for piles, easy assembling and disassembling, high efficiency.<br />
3 Pile driver machine &nbsp;is supplying pile guding device which can ensure the verticality of pile drill.<br />
4 Pilling rig Safety and reliable key parts: YANMAR-3TNV82A engine from Japan, hydraulic system main pump, main valve, swing motor travel motor are all fron KYB Japan.swing motor travel motor are all fron KYB Japan.
</p>
</span>
</p>
<p>
<span style="color:#333333;font-family:Arial, Helvetica, sans-senif;font-size:18px;">
<table border="0" cellpadding="0" cellspacing="0" width="809" style="width:608pt;" class="ke-zeroborder">
<tbody>
<tr>
<td colspan="5" height="33" class="xl65" width="554">
Technical Parameters
</td>
<td width="119">
</td>
<td width="136">
</td>
</tr>
<tr>
<td colspan="4" height="26" class="xl65">
Parameters/Model
</td>
<td class="xl66">
HWDR150
</td>
<td class="xl66">
HWDR200
</td>
<td class="xl66">
HWDR260
</td>
</tr>
<tr>
<td rowspan="2" height="82" class="xl65">
Outsize
</td>
<td colspan="2" class="xl69" width="246">
Working
Size(length×Width×Height)
</td>
<td class="xl65">
m
</td>
<td class="xl66">
5.9×2.3×10.5
</td>
<td class="xl66">
7.1×2.6×12
</td>
<td class="xl66">
8×2.8×11.5
</td>
</tr>
<tr>
<td colspan="2" height="40" class="xl69" width="246">
Transport Size(length×Width×Height)
</td>
<td class="xl65">
m
</td>
<td class="xl66">
8.2×2.3×3.25
</td>
<td class="xl66">
10×2.6×3.38
</td>
<td class="xl66">
10×2.8×3.55
</td>
</tr>
<tr>
<td colspan="3" height="26" class="xl65">
Machine Weight
</td>
<td class="xl65">
t
</td>
<td class="xl66">
17
</td>
<td class="xl66">
22
</td>
<td class="xl66">
26
</td>
</tr>
<tr>
<td colspan="3" height="26" class="xl65">
Max Drilling
Diameter
</td>
<td class="xl65">
mm
</td>
<td class="xl66">
1200
</td>
<td class="xl66">
1400
</td>
<td class="xl66">
1400
</td>
</tr>
<tr>
<td colspan="3" height="26" class="xl65">
Max Drilling Depth
</td>
<td class="xl65">
m
</td>
<td class="xl66">
15
</td>
<td class="xl66">
20
</td>
<td class="xl66">
25
</td>
</tr>
<tr>
<td rowspan="3" height="78" class="xl65">
Engine
</td>
<td colspan="3" class="xl65">
Brand&nbsp;
</td>
<td class="xl66">
Yuchai
</td>
<td class="xl66">
Cummins
</td>
<td class="xl66">
Cummins
</td>
</tr>
<tr>
<td colspan="3" height="26" class="xl65">
Model&nbsp;
</td>
<td class="xl66">
4A115Z
</td>
<td class="xl66">
6BT5.9-C150
</td>
<td class="xl66">
6BTAA5.9-C205
</td>
</tr>
<tr>
<td colspan="2" height="26" class="xl65">
Rated&nbsp; Power
</td>
<td class="xl65">
kw/rpm
</td>
<td class="xl66">
86/2400
</td>
<td class="xl66">
110/2300
</td>
<td class="xl66">
153/2000
</td>
</tr>
<tr>
<td rowspan="4" height="104" class="xl65">
Hydraulic
Flow
</td>
<td rowspan="2" class="xl65">
Woring Pressure
</td>
<td class="xl65">
Main Pump
</td>
<td class="xl65">
Mpa
</td>
<td class="xl66">
30
</td>
<td class="xl66">
30
</td>
<td class="xl66">
30
</td>
</tr>
<tr>
<td height="26" class="xl65">
Secondary Pump
</td>
<td class="xl65">
Mpa
</td>
<td class="xl66">
/
</td>
<td class="xl66">
/
</td>
<td class="xl66">
/
</td>
</tr>
<tr>
<td rowspan="2" height="52" class="xl65">
Max
Flow&nbsp;
</td>
<td class="xl65">
Main Pump
</td>
<td class="xl65">
L/min
</td>
<td class="xl66">
2×63
</td>
<td class="xl66">
2×63
</td>
<td class="xl66">
2×80
</td>
</tr>
<tr>
<td height="26" class="xl65">
Secondary Pump
</td>
<td class="xl65">
L/min
</td>
<td class="xl66">
/
</td>
<td class="xl66">
/
</td>
<td class="xl66">
/
</td>
</tr>
<tr>
<td rowspan="3" height="78" class="xl65">
Power
Head
</td>
<td colspan="2" class="xl65">
Maximum Torque
</td>
<td class="xl65">
Kn.m
</td>
<td class="xl66">
60
</td>
<td class="xl66">
80
</td>
<td class="xl66">
100
</td>
</tr>
<tr>
<td colspan="2" height="26" class="xl65">
Rotating
Speed
</td>
<td class="xl65">
rpm
</td>
<td class="xl66">
5-90
</td>
<td class="xl66">
5-85
</td>
<td class="xl66">
5-85
</td>
</tr>
<tr>
<td colspan="2" height="26" class="xl65">
Maximum
Throwing Speed
</td>
<td class="xl65">
rpm
</td>
<td class="xl66">
90
</td>
<td class="xl66">
85
</td>
<td class="xl66">
85
</td>
</tr>
<tr>
<td rowspan="3" height="78" class="xl70" width="116">
Pressurized System
</td>
<td class="xl65">
Maximum Pressure
</td>
<td class="xl65">
</td>
<td class="xl65">
Kn
</td>
<td class="xl66">
50
</td>
<td class="xl66">
70
</td>
<td class="xl66">
70
</td>
</tr>
<tr>
<td height="26" class="xl65">
Maximum Lifting Force
</td>
<td class="xl65">
</td>
<td class="xl65">
Kn
</td>
<td class="xl66">
60
</td>
<td class="xl66">
80
</td>
<td class="xl66">
80
</td>
</tr>
<tr>
<td colspan="2" height="26" class="xl67">
Maximum Travel
</td>
<td class="xl65">
mm
</td>
<td class="xl66">
2800
</td>
<td class="xl66">
2800
</td>
<td class="xl66">
2800
</td>
</tr>
<tr>
<td rowspan="2" height="52" class="xl65">
Main
Hoist
</td>
<td class="xl65">
Maximum Lifting Force
</td>
<td class="xl65">
</td>
<td class="xl65">
kn
</td>
<td class="xl66">
10
</td>
<td class="xl66">
15
</td>
<td class="xl66">
15
</td>
</tr>
<tr>
<td height="26" class="xl65">
Maximum Lifting Speed
</td>
<td class="xl65">
</td>
<td class="xl65">
m/min
</td>
<td class="xl66">
72
</td>
<td class="xl66">
71
</td>
<td class="xl66">
71
</td>
</tr>
<tr>
<td rowspan="2" height="52" class="xl65">
Deputy
hoist
</td>
<td class="xl65">
Maximum Lifting Force
</td>
<td class="xl65">
</td>
<td class="xl65">
kn
</td>
<td class="xl66">
15
</td>
<td class="xl66">
20
</td>
<td class="xl66">
30
</td>
</tr>
<tr>
<td height="26" class="xl65">
Maximum Lifting Speed
</td>
<td class="xl65">
</td>
<td class="xl65">
m/min
</td>
<td class="xl66">
60
</td>
<td class="xl66">
70
</td>
<td class="xl66">
70
</td>
</tr>
<tr>
<td rowspan="2" height="52" class="xl65">
Mast
</td>
<td class="xl65">
Tilt Left And Right
</td>
<td class="xl65">
</td>
<td class="xl65">
°
</td>
<td class="xl66">
±5
</td>
<td class="xl66">
±5
</td>
<td class="xl66">
±5
</td>
</tr>
<tr>
<td colspan="2" height="26" class="xl67">
Anterior Angle
</td>
<td class="xl65">
°
</td>
<td class="xl66">
8
</td>
<td class="xl66">
8
</td>
<td class="xl66">
8
</td>
</tr>
<tr>
<td rowspan="6" height="156" class="xl65">
Chassis
</td>
<td class="xl65">
Maximum Walking Speed
</td>
<td class="xl65">
</td>
<td class="xl65">
km/h
</td>
<td class="xl66">
4
</td>
<td class="xl66">
3
</td>
<td class="xl66">
3
</td>
</tr>
<tr>
<td colspan="2" height="26" class="xl67">
Maximum Grade
</td>
<td class="xl65">
°
</td>
<td class="xl66">
35
</td>
<td class="xl66">
35
</td>
<td class="xl66">
30
</td>
</tr>
<tr>
<td colspan="2" height="26" class="xl67">
Track Width
</td>
<td class="xl65">
mm
</td>
<td class="xl66">
500
</td>
<td class="xl66">
600
</td>
<td class="xl66">
600
</td>
</tr>
<tr>
<td height="26" class="xl65">
Track Chain Pitch
</td>
<td class="xl65">
</td>
<td class="xl65">
mm
</td>
<td class="xl66">
154
</td>
<td class="xl66">
190
</td>
<td class="xl66">
190
</td>
</tr>
<tr>
<td colspan="2" height="26" class="xl67">
Chassis Length
</td>
<td class="xl65">
mm
</td>
<td class="xl66">
3600
</td>
<td class="xl66">
3800
</td>
<td class="xl66">
4200
</td>
</tr>
<tr>
<td height="26" class="xl65">
Average Grounding Ratio
</td>
<td class="xl65">
</td>
<td class="xl65">
kPa
</td>
<td class="xl66">
66.3
</td>
<td class="xl66">
77
</td>
<td class="xl66">
85
</td>
</tr>
</tbody>
</table>
<img src="http://i.bosscdn.com/product/ec/ae/1e/a9f0ea80c231f1b3cbdf8d86b0.jpg" title="auger pile mahcine " alt="auger pile mahcine " /></span>
</p>
<p>
<span style="color:#333333;font-family:Arial, Helvetica, sans-senif;font-size:18px;"><img src="http://i.bosscdn.com/product/6b/8e/5d/b034603c82f931f2f3f8289db3.jpg" title="auger pile mahcine " alt="auger pile mahcine " /><br />
</span>
</p>
<p>
<span style="color:#333333;font-family:Arial, Helvetica, sans-senif;font-size:18px;"><img src="http://i.bosscdn.com/product/85/bf/2d/9a8c05a4b8530aa54adf1bf218.jpg" title="auger pile mahcine " alt="auger pile mahcine " /><br />
</span>
</p>
<p>
<span style="color:#333333;font-family:Arial, Helvetica, sans-senif;font-size:18px;">1, borehole drilling machine &nbsp;to reach the destination, finishing the work site, the rotary drill drill pipe put up and install&nbsp;<br />
2,borehole drilling machine in the hole at the adjustment of the drill pipe vertical, put down the shovel, began drilling work the drill.&nbsp;<br />
3, borehole drilling machine &nbsp;through the swing lever on the drill pipe around the vertical adjustment, the need to operate the swing lever operation bar, can not be pushed directly to the bit, otherwise the fixed plate will be broken.&nbsp;<br />
4,borehole drilling machine the cylinder pressurized, if the geological hard need to slow pressure,continuous excessive pressure, will make the oil tank oil or bending.&nbsp;<br />
5.borehole drilling machine in the rejection of soil when the turn to slow, too fast instability, likely to cause damage to the steering gear or other parts damage.&nbsp;<br />
Q1: Are you a manufacturer?<br />
<br />
A: Yes, we are a professional borehole drilling machine DS-40 manufacturer.<br />
<br />
Q2: What does your company produce?<br />
<br />
A: The main products of our company include borehole drilling machine DS-40,&nbsp;<br />
<br />
Q3: How about your delivery time?<br />
<br />
A: Normally the delivery time is about 7-15 days. For some special case, we can make it within 2 weeks, it depends on different products.<br />
<br />
Q4: What methods of payment do you accept?<br />
<br />
A: We accept T/T, L/C.<br />
<br />
Q5: Do you offer any deals or discounts?<br />
<br />
A: Yes, price depends on different quantity, different quantity will give you different price.<br />
<br />
</span>
</p>
<p>
<span style="color:#333333;font-family:Arial, Helvetica, sans-senif;font-size:18px;"></span>
</p>
<p>
<strong></strong>
</p>hwmac.com

  More Products from this Supplier
 
cheap auger pile boring drilling  machine

cheap auger pile boring drilling machine
Pile Earth auger bore drilling rig machine

Pile Earth auger bore drilling rig machine
 
   


[ Back Products Catalog ]

Commerce Member:
Please log in your ID and password, we will later fill in relating info.
 
ID: Password: Remember my ID on this computer
Complete this form below to send out your enquiries.
All enquiries will be automatically sent to the company you want to develop.
Subject
Content (Don't input Company Name, E-Mail, Phone Number, Fax Number, and URL)
   

 


Company Profile:
* Company Name
*E-mail
*Country
*Contact Person
URL
*Phone
- -
Fax
- -
*Postal code
*City
*Street Address
*Business Nature
Distributor   Exporter Importer Manufacturer
Whole Sale Retailer  Reseller Retrofitter User
Others, please specify:
*Security Code
Enter the security code.


Site Map l   Privacy Policy l Company Profile l Corporate Proposal l Contact Us l Help l Advertise With Us l  World Trade Link
    .