Sign In Join Help
 
Shenyang YYD Casting Co,. Ltd.

 
 
Recommended Results 
 
Adjusting ring main frame 

  Category : Machinery on-line->Rubber Processing Machines->injection machine parts

     
Adjusting ring main frame
       

  Product Specification
 
  Model No:      HP100, HP200, HP300, HP400, HP500, HP800, HP3, HP4, HP5, HP6, HP7, HP8
  Country  CN
  Minimum Order  5
  Payment Term  T/T

 

    Product Detail
  Shenyang YYD can produce spare parts and wear-resistant parts suitable for Metso series conical crusher.<br />
<p>
Including: locking screws, hopper, cone, sphere, cone, adjusting ring main frame, spherical tile, dynamic cone bushing, transmission shaft, the transmission shaft sleeve, main shaft, eccentric thrust bearing, counterweight plate, iron release assembly, eccentric bushing, eccentric sleeve, pneumatic cone cone, cone liner, liner, fixed cone liner, hydraulic motor, locking cylinder, cutting ring, disc feeder, gear ring, T seal, horizontal copper sleeve, horizontal axle and so on.
</p>
<p>
<img src="http://i.bosscdn.com/product/c6/33/63/336094170f8b41290dedba6ed3.jpg@watermark=2&color=I0ZGRkZGRg%3D%3D&type=ZHJvaWRzYW5zZmFsbGJhY2s%3D&size=22&p=5&t=80&text=eXlkY2FzdGluZy5ib3NzZ29vLmNvbQ%3D%3D" title="20180226093455" alt="20180226093455" />
</p>
The customer can also order the assembly at a favorable price. It includes main frame assembly, fixed cone assembly, moving cone assembly, spherical tile assembly, eccentric sleeve assembly, counterweight assembly, gear assembly, adjusting ring assembly, horizontal shaft assembly and so on.<br />
The applicable models are: HP100, HP200, HP300, HP400, HP500, HP800, HP3, HP4, HP5, HP6, HP7, HP8;<br />
GP11F, GP11M, GP100, GP200, GP300, GP550;<br />
<p>
GP100S, GP200S, GP300S, GP500S
</p>
<p>
<img src="http://i.bosscdn.com/product/bb/99/eb/4f4c4222da511c6dc9a8d84b18.jpg@watermark=2&color=I0ZGRkZGRg%3D%3D&type=ZHJvaWRzYW5zZmFsbGJhY2s%3D&size=22&p=5&t=80&text=eXlkY2FzdGluZy5ib3NzZ29vLmNvbQ%3D%3D" title="Wkhqv1i07m2eb7bpaaaaakv Aje898" alt="Wkhqv1i07m2eb7bpaaaaakv Aje898" />
</p>
<p>
As one of the most important parts of cone crusher machine, spindle and spindle bushing, the two would like our teeth and tongue, if the cone crusher and bushing improper assembly, in the operation of the equipment will lay great security risks, such as locking, failure caused spindle speed. This article mainly introduces the installation of the main bushing of the cone crusher, so as to ensure the good contact between the components and reduce the occurrence of the fault of the flying car of the cone crusher.
</p>
<p>
<img src="http://i.bosscdn.com/product/7b/93/dc/9c62fbe92c0ee50df486d4bdec.jpg@watermark=2&color=I0ZGRkZGRg%3D%3D&type=ZHJvaWRzYW5zZmFsbGJhY2s%3D&size=22&p=5&t=80&text=eXlkY2FzdGluZy5ib3NzZ29vLmNvbQ%3D%3D" title="1453155893" alt="1453155893" /><br />
1. Check the epoxy resin locking packing in the top chute of the eccentric sleeve has been cleaned up. The surface of the eccentric sleeve hole is clean, thoroughly cleaning the surface of the bushing and removing the surface unqualified parts.<br />
2, put dry ice in the lining of the lining to make the bushing shrink. If a 100x100 rod is placed in the center of the bushing, 90kg dry ice will be filled into the inner cavity of the bushing, leaving enough space for putting enough dry ice to cool the bushing.<br />
3, wrap a few layers of glass fiber insulation layer outside the bushing to avoid the outer frosting of the bushing, and the wrapping layer also helps to cool down more fully. After cold shrink 2h, the outer diameter of the bushing and the inner diameter of the eccentric sleeve are measured, and it is confirmed that the bushing has been fully cooled.<br />
4, the two ring bolt is screwed into the sleeve top, with ring bolt and washer bushing connected in alignment, the eccentric sleeve top and eccentric sleeve hole, quickly shrink into the inner hole of the eccentric sleeve bushing, of groove and hole, pay attention to lubricating oil on the Bush hole must be with the corresponding the hole on the eccentric sleeve is completely on.<br />
5. When the bushing is installed, the top of the bushing should be flat with the top of the eccentric sleeve. Then, according to the instructions of epoxy resin, the epoxy resin and the curing agent are mixed according to the ratio and operation requirements, and then poured into the groove of the eccentric sleeve and the top of the bushing. Before filling the locking packing, the eccentric sleeve and the epoxy resin locking filler should be controlled at room temperature 16-30 degrees. When the locking filler is completely hardened, the outstanding locking packing can be grind out.
</p>
<br />yydcasting.com

  More Products from this Supplier
 
Symons cone crusher spare parts

Symons cone crusher spare parts
H4800 Socket Liner for Sandvik Crusher

H4800 Socket Liner for Sandvik Crusher
MP800 Lower Bear Bushing

MP800 Lower Bear Bushing
Copper Shield For HEC

Copper Shield For HEC
 
   


[ Back Products Catalog ]

Commerce Member:
Please log in your ID and password, we will later fill in relating info.
 
ID: Password: Remember my ID on this computer
Complete this form below to send out your enquiries.
All enquiries will be automatically sent to the company you want to develop.
Subject
Content (Don't input Company Name, E-Mail, Phone Number, Fax Number, and URL)
   

 


Company Profile:
* Company Name
*E-mail
*Country
*Contact Person
URL
*Phone
- -
Fax
- -
*Postal code
*City
*Street Address
*Business Nature
Distributor   Exporter Importer Manufacturer
Whole Sale Retailer  Reseller Retrofitter User
Others, please specify:
*Security Code
Enter the security code.


Site Map l   Privacy Policy l Company Profile l Corporate Proposal l Contact Us l Help l Advertise With Us l  World Trade Link
    .