繁體中文 | 简体中文
B2B Global Marketing
  
   
 
 Post an offer
Post buyer offer
Post seller offer
 List by Date
Offer to buy
Offer to sell
 List by Category
Offer to buy
Offer to sell



Content


Enlarge

[CN] Alternative Energy Generators PCB Assembly / FR-4 Blue Oil Jul 18, 2020

Supplier: Shenzhen Grande Electronic
Layers:2
Application: Alternative Energy Generators PCB Assembly / FR-4 Blue Oil
PCB:FR4/1.6mm/1oz
Min Via: 0.2mm
Surface Treatment: HASL
PCBA Lead time: 3-4 weeks
Testing: 100% E-test
Standard Warp:<0.75%


[Description]
1, Turnkey solution for Alternative Energy Generators PCB Assembly / FR-4 Blue Oil
2, PCB Assembly, PCB fabrication / PCB layout, PCB Reversing.
3, Full Bespoke PCBA/ OEM/ EMS(Electronics Manufacturing Services).
4, SMT&DIP&PTH&BGA.
5, Components Sourcing.
6, Quick PCBA prototype.
7, X-ray test, ICT and Functional Circuit Test.
8, Sample and small batch order are accepted.

PCBA Service
Customer offers: Gerber file, PCB Specification, BOM and Assembly Drawing.
Full-turnkey PCBA: 1-30Layers PCB, Components Sourcing, SMT, PCBA testing, PCBA Aging test, PCBA Packing and PCBA Shipping.

PCBA Quality Assurance
1, Certifications: UL, SGS, TUV, BV, ROHS, ISO9001: 2008, TS16949: 2008
2, 7 lines dust-proof SMT lines and DIP lines.
3, All line works wear anti-static and dust-proof clothing.
4, All operators should pass strictly training before they start work.
5, SMT Equipment:solder paste printer in Jidakang,, Mounter in Panasonic, Re-flow, Wave Soldering, Semi-auto DIP
6, PCBA Test Equipment: ORT, Constant temperature and humidity chamber,3D CMM,X-Ray.
7, PCBA Test:ICT, Functional Circuit Test and X-ray test.
8, Package Processed:
0402, 0603, 0805, 1206, 1608, 2125, 3216
Micro QFP 0.2mm
Flip-chip, BGA, Connectors
BGA Ball Pitch=0.2mm
9, Each workstation in accordance with the SOP
10, Materials:FR-4, FPC, Aluminum,High TG,Halogen-Free, HF, CEM-1, CEM-3, FR-1, 94-V0 and so on.
11, Material Brand:KB, SHENGYI, NANYA and so on.

PCBA Lead Time
PCBA prototype: 7-10 working days after contract signed and EQ confirmed.
Mass production: partial delivery according to the customer’s requirement.

Other information for PCBA
1, The mass production will be arranged after PCBA prototype confirmed.
2, Use Teflon adhesive tape to protect Mount Holes and GND Holes.
3, EPE is used to avoid impact and crash.
PCBA Standard Packing
Anti-static bag and compartmental packing
Company Profile
Company: 
Shenzhen Grande Electronic Co. Ltd (click to show company details)
Contact:  Eileen Wong
URL:  **********************
Email:  Contact us
Phone:  ************
Fax:  ************
Country:  [CN]
Address:  Zhenhua Road No. 45 Car building A510, Futian District, Shenzhen, China



Commerce Member:
Please log in your ID and password, we will later fill in relating info.
 
ID
Password :
 
 
Complete this form below to send out your enquiries.
All enquiries will be automatically sent to the company you want to develop.
Subject
Content ﹙ Please Don’t Enter Company Name, E-Mail, Phone Number, Fax Number, and URL﹚
   

 


Company Profile:

*Company Name
*E-mail
*Country
*Contact Person
URL
*Phone
- -
Fax
- -
*Postal Code
*City
*Address
*Business Nature
Distributor   Exporter Importer Manufacturer
Whole Sale Retailer  Reseller Retrofitter User
Others,please specify:
*Security Code
Enter the security code.



Copyright©2024, G.T. Internet Information Co., Ltd. All Rights Reserved.